浑河沈阳段“十二五”水环境建设技术对策
Technological Countermeasures on Water Environment Building during the 12th Five-Year in Hunhe River Shenyang Section
-
摘要: 历经近10年的综合整治,沈阳市的"母亲河"-浑河已发生巨大变化,污水的收集与处理、两岸与河道建设以及河流功能修复等方面取得显著成果和效益,但距生态城市建设和河流水质目标的要求尚存在较大差距和诸多需要进一步解决的问题,本文将据此分析探讨其水环境建设主要任务、技术对策以及主要对策实施途径,为浑河沈阳段水系"十二五"建设提供技术依据Abstract: After 10 years comprehensive treatment,the Hunhe River has changed a lot and significant achievements and benifits have gotten from the aspects of collection and treatment of wastewater,construction of river bank and course and remediation of river function,while the gap of ecocity construction,water quality trargets and some other problems need to be soloved.This paper will analyze the main tasks,technological countermeasures and implementing measures of water enviroment to promote technological references for construction of Hunhe River Shenyang Section during the 12th Five-Year.
-
Key words:
- Hunhe Rive /
- the 12th Five-Year /
- Water Environment /
- Technological Countermeasures
-
-

计量
- 文章访问数: 38
- HTML全文浏览数: 38
- PDF下载数: 0
- 施引文献: 0