[1] GU Qiyuan, SUN Tichang, WU Gen, et al.Influence of carrier filling ratio on the performance of moving bed biofilm reactor in treating coking wastewater[J].Bioresource Technology, 2014,166:72-78
[2] WANG Feng, HU Yiru, GUO Chen, et al.Enhanced phenol degradation in coking wastewater by immobilized laccase on magnetic mesoporous silica nanoparticles in a magnetically stabilized fluidized bed[J].Bioresource Technology, 2012,110:120-124
[3] LI Bing, SUN YingLan, LI Yuying.Pretreatment of coking wastewater using anaerobic sequencing batch reactor (ASBR)[J].Journal of Zhejiang University SCIENCE,2005,6B (11):1115-1123
[4] 陆洪宇,孙亚全,董春娟,等.焦化废水中COD、挥发酚和硫氰化物同步高效去除[J].环境工程学报, 2014,8(7):2848-2852
[5] 董春娟, 王海会,陈素云,等.EGSB反应器处理焦化废水的启动试验研究[J].中国给水排水,2011,27(9):91-94
[6] LI Huosheng, ZHOU Shaoqi, MA Weihao, et al.Fast start-up of ANAMMOX reactor:Operational strategy and some characteristics as indicators of reactor performance[J].Desalination,2012, 286(2):436-441
[7] MONTALVO S, GUERRERO L, ROBLES M, et al.Start-up and performance of UASB reactors using zeolite for improvement of nitrate removal process[J].Ecological Engineering, 2014,70(9):437-445
[8] GOBERNA M, GADERMAIER M, FRANKE-WHITTLE I H, et al.Start-up strategies in manure-fed biogas reactors:Process parameters and methanogenic communities[J].Biomass and Bioenergy, 2015, 75(5):46-56
[9] JEONG Y S, CHUNG J S.Simultaneous removal of COD, thiocyanate, cyanide and nitrogen from coal process wastewater using fluidized biofilm process[J].Process Biochemistry,2006, 41:1141-1147
[10] KIM Y M, PARK D, LEE D S, er al.Sudden failure of biological nitrogen and carbon removal in the full-scale predenitrification process treating cokes wastewater[J].Bioresource Technology,2009, 100:4340-4347
[11] CHAKRABORTY S, VEERAMANI H.Effect of HRT and recycle ratio on removal of cyanide, phenol,thiocyanate and ammonia n anaerobic-anoxic-aerobic continuous system[J].Process Biochemistry,2006,41:96-105
[12] SAHARIAH B P, CHAKRABORTY S W.Kinetic analysis of phenol, thiocyanate and ammonia-nitrogen removals in an anaerobic-anoxic-aerobic moving bed bioreactor system[J].Journal of Hazardous Materials,2011, 190:260-267
[13] XU P, HAN H, ZHUANG H, et al.Advanced treatment of biologically pretreated coal gasification wastewater by a novel integration of heterogeneous Fenton oxidation and biological process[J].Bioresource Technology,2015,182:389-392
[14] 景雪.利用共基质代谢提高活性污泥法处理焦化废水COD的效率[J].广州环境科学,2009,24(3):11-14
[15] 国家环保总局.水和废水监测分析方法[M].北京:中国环境科学出版社,2004
[16] American Water Works Assocoation.Standard Methods for the Examination of Water and Wastewater[M].22 nd ed.Washington DC:American Public Health Association, 1999:4500-CN-M
[17] KIM Y M, PARK D, LEE D S, er al.Inhibitory effects of toxic compounds on nitrification process for cokes wastewater treatment[J].Journal of Hazardous Materials,2008,152:915-921
[18] VÁZQUEZ I, RODRÍGUEZ J, MARADIEN E,et al.Simultaneous removal of phenol, ammonium and thiocyanate from coke wastewater by aerobic biodegradation[J].Journal of Hazardous Materials,2006,137:1773-1780