[1] |
刘华,钟炜,张建民,等.城市化过程中的生态问题初探.经济地理,2006,26(1):92-95 Liu Hua,Zhong Wei,Zhang Jianmin,et al.A study of urbanization and urban ecological problems.Economic Geography,2006,26(1):92-95(in Chinese)
|
[2] |
Kayacan E.,Ulutas B.,Kaynak O.Grey system theory-based models in time series prediction.Expert Systems with Applications,2010,37(2):1784-1789
|
[3] |
冉延平,何万生,雷旭晖,等.应用灰色GM (1,1)模型及其改进模型预测渭河天水段水质.水资源与水工程学报,2011,22(5):89-91 Ran Yanping,He Wansheng,Lei Xuhui,et al.Application of GM(1,1) model and improved model to predict the water quality of Weihe River in Tianshui section.Journal of Water Resource and Water Engineering,2011,22(5):89-91(in Chinese)
|
[4] |
Hong L.,Yu L.,Lin L.Study on application of exponential smoothing method to water environment safety forecasting//2010 International Conference on E-Product E-Service and E-Entertainment (ICEEE).Henan:IEEE,2010:1-3
|
[5] |
孙兆兵,王保良,冀海峰,等.基于概率组合的水质预测方法.中国环境科学,2011,31(10):1657-1662 Sun Zhaobing,Wang Baoliang,Ji Haifeng,et al.Water quality prediction based on probability-combination.China Environmental Science,2011,31(10):1657-1662(in Chinese)
|
[6] |
孙国红,沈跃,徐应明,等.基于 Box-Jenkins 方法的黄河水质时间序列分析与预测.农业环境科学学报,2011,30(9):1888-1895 Sun Guohong,Shen Yue,Xu Yingming,et al.Time series analysis and forecast model for water quality of Yellow River based on Box-Jenkins method.Journal of Agro-Environment Science,2011,30(9):1888-1895(in Chinese)
|
[7] |
操建华,林宏伟,张实诚.基于 BP 神经网络的丹江口库区水质指标预测.电子设计工程,2010,18(3):17-24 Cao Jianhua,Lin Hongwei,Zhang Shicheng.Prediction of water quality index in Danjiangkou reserveior based on BP neural network.Electronic Design Engineering,2010,18(3):17-24(in Chinese)
|
[8] |
Zhang G.P.Time series forecasting using a hybrid ARIMA and neural network model.Neurocomputing,2003,50:159-175
|
[9] |
Reckhow K.H.Water quality simulation modeling and uncertainty analysis for risk assessment and decision making.Ecological Modelling,1994,72(1-2):1-20
|
[10] |
许其功,刘鸿亮,曾光明,等.三峡水库二维随机水质模拟预测研究.环境科学研究,2004,17(5):23-26 Xu Qigong,Liu Hongliang,Zeng Guangming,et al.Research on water quality simulation and prediction of three gorges reservoir with two dimensional stochastic model.Research of Environmental Sciences,2004,17(5):23-26(in Chinese)
|
[11] |
徐科,徐金梧,班晓娟.基于小波分解的某些非平稳时间序列预测方法.电子学报,2001,29(4):566-569 Xu Ke,Xu Jinwu,Ban Xiaojuan.Forecasting of some non-stationary time series based on wavelet decomposition.Acta Electronica Sinica,2001,29(4):566-569(in Chinese)
|
[12] |
李盘荣,马纲,侯宁.运用小波分析对非平稳时间序列的灰色预测.机电技术,2007,(2):8-10 Li Panrong,Ma Gang,Hou Ning.Application of wavelet analysis to grey prediction of non-stationary time series.Mechanical Electrical Technology,2007,(2):8-10
|
[13] |
赵洋,肖华勇,李振鹏,等.一种基于小波分析理论的灰色预测方法.西南民族大学学报 (自然科学版),2005,31(4):498-501 Zhao Yang,Xiao Huayong,Li Zhenpeng,et al.A method of grey forecasting based on wavelet analysis theory.Journal of Southwest University for Nationalities (Natural Science Edition),2005,31(4):498-501(in Chinese)
|
[14] |
顾洁.应用小波分析进行短期负荷预测.电力系统及其自动化学报,2003,15(2):40-44 Gu Jie.Application of wavelet analysis to short-term load forecasting of power system.Proceedings of the EPSA,2003,15(2):40-44(in Chinese)
|
[15] |
郑鹏辉,单锐,陈静.时间序列分析在我国财政收入预测中的应用.重庆文理学院学报 (自然科学版),2008,27(2):15-18 Zheng Penghui,Shan Rui,Chen Jing.The application of time series analysis in forecasting of our country’s financial revenue.Journal of Chongqing University of Arts and Sciences (Natural Science Edition),2008,27(2):15-18(in Chinese)
|
[16] |
许立平,罗明志.基于ARIMA模型的黄金价格短期分析预测.财经科学,2011,(1):26-34 Xu Liping,Luo Mingzhi.Short-term analysis and prediction of gold price based on ARIMA model.Finance & Economics,2011,(1):26-34(in Chinese)
|